Reducción del Lead Time utilizando metodología del sistema Toyota

Proyecto Integrador (II)--FCEFN-UNC, 2021

Bibliographic Details
Main Author: Maizel, Matías Gastón
Other Authors: Amavet, Hernan
Format: bachelorThesis
Language:spa
Published: Universidad Nacional de Córdoba. Facultad de Ciencias Exactas Físicas y Naturales. Escuela de Ingeniería. Industrial 2024
Subjects:
Online Access:http://hdl.handle.net/11086/553198
_version_ 1808112619685412864
author Maizel, Matías Gastón
author2 Amavet, Hernan
author_facet Amavet, Hernan
Maizel, Matías Gastón
author_sort Maizel, Matías Gastón
collection Repositorio Digital Universitario
description Proyecto Integrador (II)--FCEFN-UNC, 2021
format bachelorThesis
id rdu-unc.553198
institution Universidad Nacional de Cordoba
language spa
publishDate 2024
publisher Universidad Nacional de Córdoba. Facultad de Ciencias Exactas Físicas y Naturales. Escuela de Ingeniería. Industrial
record_format dspace
spelling rdu-unc.5531982024-08-09T12:15:45Z Reducción del Lead Time utilizando metodología del sistema Toyota Maizel, Matías Gastón Amavet, Hernan Proyecto Integrador II Ingeniería industrial Estudios de casos Industria automotriz Justo a tiempo Producción industrial Costos Proyecto Integrador (II)--FCEFN-UNC, 2021 Fil: Maizel, Matías Gastón. Universidad Nacional de Córdoba. Facultad de Ciencias Exactas Físicas y Naturales. Escuela de Ingeniería Industrial; Argentina. En este proyecto integrador se aplicarán diferentes herramientas aprendidas en la carrera de Ingeniería Industrial. Se realizará el estudio en una empresa radicada en Córdoba desde el año 1948, con el objetivo de fabricar elásticos de ballestas. Este trabajo se basa en el estudio de la demora en entregar piezas y de la insatisfacción de los clientes al no recibir el pedido en el plazo solicitado y en base a la metodología Kaizen, estudiar y evidenciar las causas raíz del problema para luego buscar una solución y eliminar dichas causas. In this integrating project, different tools learned in the Industrial Engineering career will be applied. The study will be carried out at a company, located in Córdoba city since 1948 with the aim of manufacturing leaf spring. This work is based on the study of the delay in delivering parts and the dissatisfaction of the clients in receiving the order in the requested period and based on the Kaizen methodology, studying and evidencing the root causes of the problem and then looking for a solution and eliminate the causes. Fil: Maizel, Matías Gastón. Universidad Nacional de Córdoba. Facultad de Ciencias Exactas Físicas y Naturales. Escuela de Ingeniería Industrial; Argentina. 2024-08-08T13:18:53Z 2024-08-08T13:18:53Z 2021 bachelorThesis PI-II 5682 Ma T05682 http://hdl.handle.net/11086/553198 spa Attribution-NonCommercial-ShareAlike 4.0 International http://creativecommons.org/licenses/by-nc-sa/4.0/ Universidad Nacional de Córdoba. Facultad de Ciencias Exactas Físicas y Naturales. Escuela de Ingeniería. Industrial
spellingShingle Proyecto Integrador II
Ingeniería industrial
Estudios de casos
Industria automotriz
Justo a tiempo
Producción industrial
Costos
Maizel, Matías Gastón
Reducción del Lead Time utilizando metodología del sistema Toyota
title Reducción del Lead Time utilizando metodología del sistema Toyota
title_full Reducción del Lead Time utilizando metodología del sistema Toyota
title_fullStr Reducción del Lead Time utilizando metodología del sistema Toyota
title_full_unstemmed Reducción del Lead Time utilizando metodología del sistema Toyota
title_short Reducción del Lead Time utilizando metodología del sistema Toyota
title_sort reduccion del lead time utilizando metodologia del sistema toyota
topic Proyecto Integrador II
Ingeniería industrial
Estudios de casos
Industria automotriz
Justo a tiempo
Producción industrial
Costos
url http://hdl.handle.net/11086/553198
work_keys_str_mv AT maizelmatiasgaston reducciondelleadtimeutilizandometodologiadelsistematoyota