El Catálogo Colectivo reúne los registros del material que posee cada una de las
bibliotecas de la Universidad Nacional de Córdoba, pudiendo encontrarse colecciones
especializadas y actualizadas en todas las áreas del conocimiento; lo que permite una
amplia visibilidad y garantiza el acceso al patrimonio documental de la Universidad.
Se encuentra disponible para toda la comunidad académica: estudiantes, docentes,
egresados e investigadores.
Si formas parte de la comunidad de la UNC también podés solicitar préstamos de material,
a cualquier biblioteca universitaria, utilizando el servicio de préstamo interbibliotecario,
independientemente de la facultad a la que pertenezcas, la carrera que curses o la cátedra
que dictes.
The objective of the Flood Projection Project is to improve the security of economic assets and persons living in flood-prone areas by constructing defense facilities to reduce future losses due to floods, and by strengthening national and provincial institutions and systems for dealing with future...
|a Argentina : flood protection project
|c / Banco Mundial
260
|b World Bank
|a Washington, D.C.
|c 1996
300
|a iii, 131 p. :
|b il.
490
|a Staff appraisal report
|v no.15354-AR
504
|a Incluye bibliografía
520
|a The objective of the Flood Projection Project is to improve the security of economic assets and persons living in flood-prone areas by constructing defense facilities to reduce future losses due to floods, and by strengthening national and provincial institutions and systems for dealing with future floods as a next phase after the Flood Rehabilitation Project to restore the assets lost in the recent floods. The specific objectives will be to enhance provincial capacity to deal with periodic flooding by upgrading their flood preparedness and mitigation systems, as well as strengthening coordination within the Basin. The project will support the first phase of a two-stage Flood Protection Program. It will include the following components: a) structural measures; and b) non structural measures consisting of a new institutional framework, upgrading of flood preparedness, early flood warning system and project implementation and administration.