Argentina : El Niño emergency flood project

The objective of the El Nino Emergency Flood Project is to offset the damaging impact of El Nino in: i) six northwestern provinces and three Cuyo provinces; and ii) seven littoral provinces through additional works above and beyond the Flood Protection Project. The project has been designed with two...

Full description

Bibliographic Details
Corporate Authors: Banco Mundial, Argentina. Ministerio del Interior. Sub-Unidad Central de Coordinación para la Emergencia
Format: Book
Published: Washington, D.C. World Bank December 1997
Series:Technical annex no. T 7209 AR
Subjects:

MARC

LEADER 00000nam a2200000 a 4500
082 |a 353.95 B 47556 
090 |c 16492  |d 16492 
110 |a Banco Mundial 
245 |a Argentina : El Niño emergency flood project 
260 |b World Bank 
260 |a Washington, D.C. 
260 |c December 1997 
300 |a ii, 67 p. + anexo  |b grafs., tbls., il. 
490 |a Technical annex  |v no. T 7209 AR 
500 |a Incluye anexo: Memorandum and recommendation 
504 |a Incluye bibliografía 
505 |a Incluye anexo: Memorandum and recommendation 
520 |a The objective of the El Nino Emergency Flood Project is to offset the damaging impact of El Nino in: i) six northwestern provinces and three Cuyo provinces; and ii) seven littoral provinces through additional works above and beyond the Flood Protection Project. The project has been designed with two geographical components: one for the six northwestern provinces and the three Cuyo provinces, and another for the seven participating littoral provinces. A third component is designed to strengthen the administrative and technical capacity to coordinate the implementation of the project. The operation will be implemented in two phases: 1) a protection phase of 12 months for the northwestern provinces, which includes acquiring of goods and execution of works for emergency river flood control; and b) a rehabilitation phase for both geographic regions, which includes transport infrastructure, drainage systems, education and health facilities. In addition, there is a capacity-building subcomponent for the northwestern provinces to manage flood emergencies and a small scale housing subcomponent for housing reconstruction.  
650 |a DESASTRES NATURALES  
650 |a INUNDACIONES  
650 |a FINANCIAMIENTO DE PROYECTOS  
650 |a PREVENCION DE DESASTRES  
650 |a DOCUMENTOS DE PROYECTO 
650 |a CATASTROFES NATURALES 
653
710 |a Banco Mundial 
710 |a Banco Mundial 
710 |a Argentina. Ministerio del Interior. Sub-Unidad Central de Coordinación para la Emergencia 
920 |a 47556 
942 |c LIBR  |j 353.95 B 47556 
952 |0 0  |1 0  |4 0  |6 353_950000000000000_B_47556  |7 0  |9 20364  |a BMB  |b BMB  |d 2010-01-01  |l 0  |o 353.95 B 47556  |p 47556  |r 2010-08-26 00:00:00  |u 18153  |w 2010-08-26  |y LIBR 
999 |c 16465  |d 16465